Contact Us
- No.8 Shangxian Road North Industry Zone, Huangyan, Taizhou, China
- info@halomould.com
- +8613750618222
Folding Table MouldFolding tables are one of the most versatile and convenient pieces of furniture available today. They’re perfect for use in a wide range of settings, including homes, schools, offices, and events.
Add to Inquiry
Pc Stool MouldPC stool moulds are used to manufacture sturdy and durable stools made from polycarbonate material. These moulds offer several benefits, such as customizable designs, smooth finishing, and
Add to Inquiry
Baby Stool MouldHaLo mould is a China high-quality baby table stool mould manufacturer,we manufacture all kinds of baby table moulds,we export to around 30 countries.
Add to Inquiry
Double Color Stool MouldHaLo mould is a China high-quality double color stool mould manufacturer,we manufacture all kinds of double color stool mould and OEM products.
Add to Inquiry
|
Mould Name |
Baby Plastic Stool Mould Small Stool Injection Mould Kids Foot Step Stool Injection Mould |
|
Mold meterial |
P20,2738,718H,NAK80,H13,2316,2344,S136,etc. |
|
Mold base |
Self-mad:LKM:DME |
|
Runner |
Cold runner and hot runner |
|
Hot runner brand |
YUDO and Local brand |
|
Degsin software |
UG,CAD and so on |
|
Mold life |
50-500 million Shots/ 5-6 years, Even in 10 years in good maintenance |
|
T1 time |
45-60 days |
|
Package |
Wooden Case |
|
Plastic material |
PP PC ABS PET PE PVC PMMA TPR PA6,PA66,ASA,POM,ABS,ABS+GF,ABS+PC,POM(Derlin) |
|
Warranty period |
1 year or 1 million shot times(in this period, if the mold have problem, we will offer the parts or service by free, but not include the problems cased by wrong operation) |
|
Mould Precision |
+/-0.01mm |
|
Mould Cavity |
Single Cavity, Multi-cavity |
|
Gate Type |
Pinpoint Gate, Edge Gate, Sub Gate, Film Gate, Valve Gate, Open Gate, etc. |
|
Mould Surface Treatment |
EDM, texture, high gloss polishing |
|
Quality System |
ISO9001,SGS |
|
HS code |
8480719090 |
|
Origin |
Made in China |
|
Installation |
Fixed |
|
Cavity |
Single/multi |
|
Specification |
Depends on customer's requirements |
|
Mold cooling system |
Water cooling or Beryllium bronze cooling, etc. |
|
Mold hot treatment |
Quencher, nitridation, tempering,etc. |
|
The main Mold Steel and Hardness for you reference |
||||||||
|
Steel Grade |
S50C |
P20 |
P20HH |
718H |
2738H |
H13 |
S136 |
NAK80 |
|
Hardness(HRC) |
17-22 |
27-30 |
33-37 |
33-38 |
36-40 |
45-52 |
48~52 |
34-40 |
Mould Design Control
Kelong can provide product analysis and Moldflow reports and will provide feedback to customers on any issues arising from the product drawing, such as thin thickness areas, shrinkage marks, welting marks, air vents, undercuts, gate location, gate type, etc. After the design is completed, we'll check the mould strength, part line, cooling system, interference areas, thin thickness areas, etc., to ensure that the drawing provided by Kelong is in excellent condition for a longer mould life and better work efficiency for customers.
Mould Material Control
Steel suppliers are required to provide a steel quality guarantee certificate and steel certification. Kelong will perform a steel inspection before acceptance.
Mould Processing Quality Control
We control key procedure quality and manage the project progress according to mould processing documents. We provide weekly progress and quality reports to customers.
The mould technician is required to check the mould appearance, cooling system, mould assembly, and process procedures carefully according to Kelong's standards and the customer's standards.


Mould Spare Parts Purchasing and Control
We'll focus on ensuring qualified spare parts meet customer requirements regarding standard parts models, quality, and required purchase timelines.
Mould Assembly Control
Physical processing will be undertaken according to the established procedure documents and inspected accordingly. Strict checks will be made on the matching of the core, cavity, inserts, guide pillars, return pins, angle lifters, sliders, ejector pins, cooling system, connectors, etc.
Mould Check Before Shipment
We will prepare the necessary documents before shipment, such as the spare parts list, mould testing video, processing files, and 2D/3D drawings. We will ensure that the mould is packed and shipped according to the customer's requirements, with safety protection for both sea and air shipment.
|
1 |
RFQ |
Get the sample or drawing from customer, analyze and quote as per customer requests, make DFM, give some professional suggestions to help customer improve the product |
|
2 |
Negotiation |
Discuss about the mould steel, delivery time, payment term and so on |
|
3 |
Place an order |
Customer confirms the plastic material, injection machine spec and other details, we start make the design |
|
4 |
Mould design |
Make the mould design on the basis of confirmed product design, accordingly customer machine spec and other requests. |
|
5 |
Mould tooling |
Start the mould tooling after mould design confirmed.(Cut steel, CNC machining, polishing, testing.) |
|
6 |
Mould processing |
Mould process photo or video update to customer each 10 days |
|
7 |
Test sample |
T1: Checking if mould working corrects, if the dimension, weight, wall thickness meet customer request. If everything ok, send the sample to customer approve |
|
8 |
Delivery |
Once sample approved, we check eavey detials of mould, make sure the mould work well, than will ship the moulds within 7 days after get customer ship |
Certification


FAQ
We're professional stool mould manufacturers in China, specialized in providing high quality customized service. We warmly welcome you to buy OEM stool mould at competitive price from our factory. For more information, contact us now.
Pc Stool Mould, Folding Table Mould, Double Color Stool Mould